AI PPT Maker
Templates
PPT Bundles
Design Services
Business PPTs
Business Plan
Management
Strategy
Introduction PPT
Roadmap
Self Introduction
Timelines
Process
Marketing
Agenda
Technology
Medical
Startup Business Plan
Cyber Security
Dashboards
SWOT
Proposals
Education
Pitch Deck
Digital Marketing
KPIs
Project Management
Product Management
Artificial Intelligence
Target Market
Communication
Supply Chain
Google Slides
Research Services
One PagersAll Categories
Tasks progress PowerPoint Presentation Templates and Google Slides
58 Item(s)









Slide 1 of 9
If designing a presentation takes a lot of your time and resources and you are looking for a better alternative, then this Task Status Progress Update Ppt PowerPoint Presentation Complete With Slides is the right fit for you. This is a prefabricated set that can help you deliver a great presentation on the topic. All the nine slides included in this sample template can be used to present a birds-eye view of the topic. These slides are also fully editable, giving you enough freedom to add specific details to make this layout more suited to your business setting. Apart from the content, all other elements like color, design, theme are also replaceable and editable. This helps in designing a variety of presentations with a single layout. Not only this, you can use this PPT design in formats like PDF, PNG, and JPG once downloaded. Therefore, without any further ado, download and utilize this sample presentation as per your liking.







Slide 1 of 7
This is a tabular reports task in progress powerpoint show. This is a four stage process. The stages in this process are visual reports, projects status, completed task, milestones, tabular reports, task status, task in progress, wbs.
Slide 1 of 5
Presenting this set of slides with name task progress icon ppt powerpoint presentation file show. The topics discussed in these slides are project management, project progress, project growth. This is a completely editable PowerPoint presentation and is available for immediate download. Download now and impress your audience.
Slide 1 of 5
This is a task progress icon ppt powerpoint presentation model summary. This is a four stage process. The stages in this process are project management, project progress, project growth.





Slide 1 of 5
This is a three stages of task progress ppt powerpoint presentation infographics graphics example. This is a three stage process. The stages in this process are task completion, assignment completion, work completion.





Slide 1 of 5
This is a task progress report template ppt powerpoint presentation styles objects. This is a three stage process. The stages in this process are task completion, assignment completion, work completion.





Slide 1 of 5
This is a task progress report priority and status ppt powerpoint presentation infographic template ideas. This is a five stage process. The stages in this process are business goals, business objectives, business priorities.
Slide 1 of 2
The following slide illustrates task management tool for tracking project status. It provides information about requirements, coding, development, knowledge, user acceptance testing, standup meeting, etc. Welcome to our selection of the Tracking Progress Of Project Management Tasks Ppt PowerPoint Presentation Diagram Graph Charts PDF. These are designed to help you showcase your creativity and bring your sphere to life. Planning and Innovation are essential for any business that is just starting out. This collection contains the designs that you need for your everyday presentations. All of our PowerPoints are 100 percent editable, so you can customize them to suit your needs. This multi purpose template can be used in various situations. Grab these presentation templates today.


Slide 1 of 2
Here an illustrative One Pager Project Progress And Task Management Report PDF Document PPT Template. This one-pager template is designed to match your needs. It is 100 percent editable, which allows you to make changes as you seem fit to suit your purpose. Grab this One Pager Project Progress And Task Management Report PDF Document PPT Template Download now.
Slide 1 of 2
The following slide illustrates task management tool for tracking project status. It provides information about requirements, coding, development, knowledge, user acceptance testing, standup meeting, etc.Retrieve professionally designed Tracking Progress Of Project Management Tasks Guidelines PDF to effectively convey your message and captivate your listeners. Save time by selecting pre-made slideshows that are appropriate for various topics, from business to educational purposes. These themes come in many different styles, from creative to corporate, and all of them are easily adjustable and can be edited quickly. Access them as PowerPoint templates or as Google Slides themes. You Do not have to go on a hunt for the perfect presentation because Slidegeeks got you covered from everywhere.


Slide 1 of 2
This slide covers status summary of software development project and task allotment report. It includes details such as key stakeholders, tasks list, assigned person, start dates, top concerns, open actions, task meter,milestones, etc. Pitch your topic with ease and precision using this Software Development Project Task Progress Scorecard Ideas PDF. This layout presents information on Performance Analysis, Document Generation, Change Requests. It is also available for immediate download and adjustment. So, changes can be made in the color, design, graphics or any other component to create a unique layout.


Slide 1 of 2
This slide covers project progress summary with task status graph and timeline. It also includes details such project manager, status, budget allocations as per planned spent, count of risks issues, count of pending tasks and key updates. Showcasing this set of slides titled Project Timeline And Task Progress Scorecard With Budget Allocations Structure PDF. The topics addressed in these templates are Project Manager, Project Progress, Project Sponsor. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.


Slide 1 of 2
This slide covers monthly allotted task schedule and status summary. It includes elements like tasks, assigned person, completion status for all tasks along with allotment dates.Showcasing this set of slides titled Monthly Task Schedule Progress Scorecard With Assigned Employees Brochure PDF. The topics addressed in these templates are Materials Finalization, Identification Allocation, Risk Assessment. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.


Slide 1 of 2
This slide covers different marketing tasks for each quarter with key assigned persons to increase conversions and sales. It includes elements such as task list, assigned person, completion priority status, progress timeline, goals and budget allocations. Showcasing this set of slides titled Marketing Task Progress Scorecard With Goals And Assigned Budgets Slides PDF. The topics addressed in these templates are Increasing Conversion, Conduct Competitor, Website Homepage. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.


Slide 1 of 2
This slide covers task completion output report sheet for a week. It includes task, assigned person, priority status and the task progress bar with percentage.Pitch your topic with ease and precision using this Employees Task Prioritization Progress Scorecard Download PDF. This layout presents information on Communication Skills Development, Manager Training, Area Sales . It is also available for immediate download and adjustment. So, changes can be made in the color, design, graphics or any other component to create a unique layout.


Slide 1 of 2
This slide covers information about various tasks allotted to workforce. It includes detail about task ID, employee assigned, priority status, completion progress bar and other additional information. Showcasing this set of slides titled Employees Task Allotment And Completion Progress Scorecard Information PDF. The topics addressed in these templates are Opening Meeting, Media Engagement, Brainstorming Session. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.
Slide 1 of 2
The following slide illustrates task management tool for tracking project status. It provides information about requirements, coding, development, knowledge, user acceptance testing, standup meeting, etc. Slidegeeks has constructed Tracking Progress Of Project Management Tasks Integrating Cloud Computing To Enhance Projects Effectiveness Microsoft PDF after conducting extensive research and examination. These presentation templates are constantly being generated and modified based on user preferences and critiques from editors. Here, you will find the most attractive templates for a range of purposes while taking into account ratings and remarks from users regarding the content. This is an excellent jumping off point to explore our content and will give new users an insight into our top notch PowerPoint Templates.
Slide 1 of 2
The following slide illustrates task management tool for tracking project status. It provides information about requirements, coding, development, knowledge, user acceptance testing, standup meeting, etc. The best PPT templates are a great way to save time, energy, and resources. Slidegeeks have 100 percent editable powerpoint slides making them incredibly versatile. With these quality presentation templates, you can create a captivating and memorable presentation by combining visually appealing slides and effectively communicating your message. Download Deploying Cloud Technology Tracking Progress Of Project Management Tasks Ppt Ideas Example Introduction PDF from Slidegeeks and deliver a wonderful presentation.


Slide 1 of 2
This slide elaborates about the project of the web development and its status on every step with budget allocation and the number of tasks completed or will be completing in certain amount of time. Showcasing this set of slides titled Project Overview Dashboard With Budget And Task Completion Progress Slides PDF. The topics addressed in these templates are Project Title, Budget, Risks. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.


Slide 1 of 2
This slide showcases monthly project status dashboard with assigned tasks. It provides information about kick off meeting, resource plan, technical requests, development, hardware configuration, budget, pending items, etc. Pitch your topic with ease and precision using this Monthly Project Progress Report Dashboard With Assigned Tasks Ppt Styles Clipart PDF. This layout presents information on Pending Items, Budget, Kick Off Meeting. It is also available for immediate download and adjustment. So, changes can be made in the color, design, graphics or any other component to create a unique layout.


Slide 1 of 2
Pitch your topic with ease and precision using this Timeline To Review Project Progress With Task Status Elements PDF. This layout presents information on Timeline To Review Project, Progress With Task Status. It is also available for immediate download and adjustment. So, changes can be made in the color, design, graphics or any other component to create a unique layout.


Slide 1 of 2
Looking for a predesigned Retropop Ring Bound One Page Task Progress Per Day Planner Report PDF Document PPT Template Heres the perfect piece for you It has everything that a well-structured one-pager template should have. Besides, it is 100 percent editable, which offers you the cushion to make adjustments according to your preferences. Grab this Retropop Ring Bound One Page Task Progress Per Day Planner Report PDF Document PPT Template Download now.


Slide 1 of 2
This slide showcase report dashboard of project management representing task progress status. It covers project name, status, tasks, priority, budget and pending items for the project. Showcasing this set of slides titled Project Management Report Dashboard Exhibiting Task Progress Diagrams PDF. The topics addressed in these templates are Company Website Development, Tasks Status, Budget. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.


Slide 1 of 2
This slide shows the parameters to measure timeliness of project activities which includes cycle time, time spent, on-time completion percentage, number of adjustments, planned hours vs. actual time spent, etc.Deliver and pitch your topic in the best possible manner with this Coordinating Distinct Activities For Effective Project Time Management Preparing Project Task List To Track Progress Professional PDF Use them to share invaluable insights on Project Stakeholders, Mitigation Strategies, Project Deliverables and impress your audience. This template can be altered and modified as per your expectations. So, grab it now.
Slide 1 of 2
The slide shows the task tracker of a project with start and end date. The tracker includes summary, priority, duration, status and completion status. Showcasing this set of slides titled Project Task Tracker List With Progress And Completion Portrait PDF. The topics addressed in these templates are Project Task Tracker, Progress And Completion. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.
Slide 1 of 2
The following slide illustrates task management tool for tracking project status. It provides information about requirements, coding, development, knowledge, user acceptance testing, standup meeting, etc. Deliver and pitch your topic in the best possible manner with this How To Implement Cloud Collaboration Tracking Progress Of Project Management Tasks Themes PDF. Use them to share invaluable insights on Detailed Requirements, Design Delivery, Daily Project and impress your audience. This template can be altered and modified as per your expectations. So, grab it now.


Slide 1 of 2
Persuade your audience using this Project Management Plan With Priority Status And Task Progress Ideas PDF. This PPT design covers one stages, thus making it a great tool to use. It also caters to a variety of topics including Marketing, Service, Develop. Download this PPT design now to present a convincing pitch that not only emphasizes the topic but also showcases your presentation skills.


Slide 1 of 2
This slide exhibits IT project time management dashboard with task progress. It contains information about project or task entry, time taken, budget, etc. which can be beneficial in tracking an IT projects weekly budget and time. Showcasing this set of slides titled it project time scheduling dashboard with task progress sample pdf. The topics addressed in these templates are project, budget. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.


Slide 1 of 2
In this slide, we have shown the progress status of each task of the user story to ensure that the agile sprint is on track. User stories tasks are segmented into three buckets i.e. not started, in progress and completed. This is a agile user story software with task progress ppt slides infographics pdf template with various stages. Focus and dispense information on one stages using this creative set, that comes with editable features. It contains large content boxes to add your information on topics like agile user story software with task progress. You can also showcase facts, figures, and other relevant content using this PPT layout. Grab it now.


Slide 1 of 2
In this dashboard, we have highlighted the milestones along with budgets, risks, number of tasks completed pertaining to a specific project. Deliver an awe inspiring pitch with this creative project management under supervision project milestones dashboard with tasks in progress mockup pdf bundle. Topics like design, develop, internal testing, budget, deploy can be discussed with this completely editable template. It is available for immediate download depending on the needs and requirements of the user.


Slide 1 of 2
This slide represents project stakeholder dashboard which showcase project name, progress ,cost, budget and team. It used to analyze the task efficiency and the cost involved in the process. Showcasing this set of slides titled project leader task progress and cost management ppt powerpoint presentation file slides pdf. The topics addressed in these templates are product roadmap, system migration, cost or budget. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.


Slide 1 of 2
Showcasing this set of slides titled task management report with progress and workload ppt powerpoint presentation summary background designs pdf. The topics addressed in these templates are gathering project requirement, tasks progress, employee workload. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.


Slide 1 of 2
Presenting list of tasks with progress and completed ppt styles aids pdf to dispense important information. This template comprises three stages. It also presents valuable insights into the topics including low priority, medium priority, high priority. This is a completely customizable PowerPoint theme that can be put to use immediately. So, download it and address the topic impactfully.


Slide 1 of 2
The following slide displays the dashboard for agile software development. The dashboard highlights multiple sprints of the web designing team, research and development team, customer support team etc. along with some details such as story points, sprint progress, work completed, time elapsed etc. Deliver and pitch your topic in the best possible manner with this agile model improve task team performance agile software development dashboard with sprint progress ideas pdf. Use them to share invaluable insights on web designing team, research and development team, customer support team and impress your audience. This template can be altered and modified as per your expectations. So, grab it now.
Slide 1 of 2
Showcasing this set of slides titled tracking dashboard showing project tasks progress ppt powerpoint presentation file example introduction pdf. The topics addressed in these templates are monitoring, resources, sales. All the content presented in this PPT design is completely editable. Download it and make ajustments in color, background, font etc. as per your unique business setting.


Slide 1 of 2
Presenting this set of slides with name task progress report with specification ppt powerpoint presentation gallery structure pdf. The topics discussed in these slides are business, development, planning. This is a completely editable PowerPoint presentation and is available for immediate download. Download now and impress your audience.
Slide 1 of 2
Presenting this set of slides with name task progress report with icons ppt powerpoint presentation file graphic images pdf. This is a four stage process. The stages in this process are task progress report with icons. This is a completely editable PowerPoint presentation and is available for immediate download. Download now and impress your audience.


Slide 1 of 2
Presenting this set of slides with name task progress chart with actual start ppt powerpoint presentation file graphics pdf. The topics discussed in these slides are plan, duration, actual. This is a completely editable PowerPoint presentation and is available for immediate download. Download now and impress your audience.


Slide 1 of 2
Presenting this set of slides with name four projects task progress report ppt powerpoint presentation gallery graphics download pdf. The topics discussed in these slide is four projects task progress report. This is a completely editable PowerPoint presentation and is available for immediate download. Download now and impress your audience.


Slide 1 of 2
Presenting this set of slides with name optimizing tasks team collaboration agile operations agile software development dashboard with sprint progress ideas pdf. The topics discussed in these slides are web designing team, customer support team, research and development team. This is a completely editable PowerPoint presentation and is available for immediate download. Download now and impress your audience.









Slide 1 of 9
This slide shows a tracker for everyday activities performed by various departments in organization to avoid project delays and business issues. It includes details about completion percentage, priority level, days, etc. Showcasing this set of slides titled Daily Progress Summary For Tasks Assigned To Employees Designs PDF. The topics addressed in these templates are Customer Support, Target, Marketing. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.









Slide 1 of 9
This slide provide information about construction project status along with due date to complete it on time without any delay. It includes elements such as key stakeholders, milestones, budget, assumptions, risks and constraints Pitch your topic with ease and precision using this Construction Work Progress Report Report For Analyzing Task Introduction PDF. This layout presents information on Key Shareholders, Key Milestones, Budget. It is also available for immediate download and adjustment. So, changes can be made in the color, design, graphics or any other component to create a unique layout.








Slide 1 of 9
Presenting Project Manager Icon Assessing Task Progress Diagrams PDF to dispense important information. This template comprises three stages. It also presents valuable insights into the topics including Project Manager, Icon Assessing, Task Progress. This is a completely customizable PowerPoint theme that can be put to use immediately. So, download it and address the topic impactfully.








Slide 1 of 9
Persuade your audience using this Project Task And Progress Status Icon Ppt PowerPoint Presentation File Gridlines PDF. This PPT design covers three stages, thus making it a great tool to use. It also caters to a variety of topics including Project, Task And Progress, Status Icon. Download this PPT design now to present a convincing pitch that not only emphasizes the topic but also showcases your presentation skills.









Slide 1 of 9
Persuade your audience using this Meeting Task Deadlines Through Progress Summary Demonstration PDF. This PPT design covers three stages, thus making it a great tool to use. It also caters to a variety of topics including Meeting Task, Deadlines, Progress Summary. Download this PPT design now to present a convincing pitch that not only emphasizes the topic but also showcases your presentation skills.








Slide 1 of 9
Showcasing this set of slides titled Task Completion Progress Scorecard Icon Template PDF. The topics addressed in these templates are Task Completion, Progress Scorecard. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.









Slide 1 of 9
This slide covers new product launch event preparation activities chart. It further includes team leader details, activity priority status along with the task progress status. Persuade your audience using this Product Launch Event Campaign Task Progress Scorecard Guidelines PDF. This PPT design covers five stages, thus making it a great tool to use. It also caters to a variety of topics including Campaign Activities, Budget Assigned, Department Approval. Download this PPT design now to present a convincing pitch that not only emphasizes the topic but also showcases your presentation skills.









Slide 1 of 9
This slide covers week wise tasks allotment status summary for multiple categories. It includes categories such s billing, data mart, fulfilment, inventory, portal, etc. along with status legends.Pitch your topic with ease and precision using this Monthly Agile Task Progress Summary Scorecard Professional PDF. This layout presents information on Product Reconciliation, Maintain Invoice Database, Commissions Upgrade. It is also available for immediate download and adjustment. So, changes can be made in the color, design, graphics or any other component to create a unique layout.








Slide 1 of 9
This slide exhibits project task planning chart for tracking progress illustrating task description, starting date, planned ending date, actual end date, planned work days etc that helps in tracking project progress. Showcasing this set of slides titled Project Task Management Chart For Tracking Progress Themes PDF. The topics addressed in these templates are Requirements Analysis, Business Case, Configuration Management. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.

Slide 1 of 1
This slide represents the project task list to track progress and create schedule accordingly which includes registration date, description, responsible person, due date, status and other comments. Make sure to capture your audiences attention in your business displays with our gratis customizable Project Time Management Execution Strategies Preparing Project Task List To Track Progress Summary PDF. These are great for business strategies, office conferences, capital raising or task suggestions. If you desire to acquire more customers for your tech business and ensure they stay satisfied, create your own sales presentation with these plain slides.









Slide 1 of 9
This slide showcases monthly task status of project site. It provides information about planned commencement, completion, revised completion, status, budget, progress, etc. Showcasing this set of slides titled Monthly Progress Report Task Of Project Site Ppt Show Backgrounds PDF. The topics addressed in these templates are Project Management Description, Planned Commencement Date, Building Concept Design. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.









Slide 1 of 9
This slide showcases construction project tasks with monthly status. It provides information about time period, progress score, issues, tasks completed, progress, upcoming, etc. Showcasing this set of slides titled Construction Project Progress Report Tasks Monthly Report Ppt Show Shapes PDF. The topics addressed in these templates are Tasks Completed, Tasks Progress, Tasks Coming Next. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.








Slide 1 of 9
Showcasing this set of slides titled Gantt Chart Icon Exhibiting Project Management Task Progress Report Icons PDF. The topics addressed in these templates are Gantt Chart Icon, Exhibiting Project Management, Task Progress Report. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.









Slide 1 of 9
This slide exhibits project task progress report. It covers project tasks, assigned employees, priority, status and completion rate that enables managers to track project development. Presenting Project Management Task Status And Progress Report Ppt Styles Ideas PDF to dispense important information. This template comprises five stages. It also presents valuable insights into the topics including Project Task, Employee Assigned, Priority, Completion Progress. This is a completely customizable PowerPoint theme that can be put to use immediately. So, download it and address the topic impactfully.









Slide 1 of 9
Pitch your topic with ease and precision using this Project Meeting Schedule With Status And Task Progress Ppt Styles Graphics Template PDF. This layout presents information on Meeting Agenda, Milestones, Priority Status. It is also available for immediate download and adjustment. So, changes can be made in the color, design, graphics or any other component to create a unique layout.









Slide 1 of 9
This slide represents the project task list to track progress and create schedule accordingly which includes registration date, description, responsible person, due date, status and other comments.Deliver an awe inspiring pitch with this creative Time Management Techniques For Successful Project Preparing Project Task List To Track Progress Structure PDF bundle. Topics like Project Stakeholders, Acceptance Criteria, Project Stakeholders can be discussed with this completely editable template. It is available for immediate download depending on the needs and requirements of the user.









Slide 1 of 9
This slide represents the project task list to track progress and create schedule accordingly which includes registration date, description, responsible person, due date, status and other comments.Deliver and pitch your topic in the best possible manner with this Project Time Management To Enhance Productivity Preparing Project Task List To Track Progress Professional PDF. Use them to share invaluable insights on Generate Stakeholder, Management Planning, Mitigation Strategies and impress your audience. This template can be altered and modified as per your expectations. So, grab it now.









Slide 1 of 9
This slide represents the project task list to track progress and create schedule accordingly which includes registration date, description, responsible person, due date, status and other comments. This slide represents the project task list to track progress and create schedule accordingly which includes registration date, description, responsible person, due date, status and other comments. Deliver and pitch your topic in the best possible manner with this Techniques For Timely Project Preparing Project Task List To Track Progress Information PDF. Use them to share invaluable insights on Responsible Person, Other Comments, Project Stakeholders and impress your audience. This template can be altered and modified as per your expectations. So, grab it now.