AI PPT Maker
Templates
PPT Bundles
Design Services
Business PPTs
Business Plan
Management
Strategy
Introduction PPT
Roadmap
Self Introduction
Timelines
Process
Marketing
Agenda
Technology
Medical
Startup Business Plan
Cyber Security
Dashboards
SWOT
Proposals
Education
Pitch Deck
Digital Marketing
KPIs
Project Management
Product Management
Artificial Intelligence
Target Market
Communication
Supply Chain
Google Slides
Research Services
One Pagers
All Categories
Project status update PowerPoint Presentation Templates and Google Slides
48 Item(s)




















Slide 1 of 20
Improve your presentation delivery using this 4 Months Project Status Update Ppt PowerPoint Presentation Complete Deck With Slides. Support your business vision and objectives using this well-structured PPT deck. This template offers a great starting point for delivering beautifully designed presentations on the topic of your choice. Comprising twenty this professionally designed template is all you need to host discussion and meetings with collaborators. Each slide is self-explanatory and equipped with high-quality graphics that can be adjusted to your needs. Therefore, you will face no difficulty in portraying your desired content using this PPT slideshow. This PowerPoint slideshow contains every important element that you need for a great pitch. It is not only editable but also available for immediate download and utilization. The color, font size, background, shapes everything can be modified to create your unique presentation layout. Therefore, download it now.












Slide 1 of 12
If designing a presentation takes a lot of your time and resources and you are looking for a better alternative, then this Weekly Project Status Update Summary Document Ppt PowerPoint Presentation Complete Deck With Slides is the right fit for you. This is a prefabricated set that can help you deliver a great presentation on the topic. All the twelve slides included in this sample template can be used to present a birds-eye view of the topic. These slides are also fully editable, giving you enough freedom to add specific details to make this layout more suited to your business setting. Apart from the content, all other elements like color, design, theme are also replaceable and editable. This helps in designing a variety of presentations with a single layout. Not only this, you can use this PPT design in formats like PDF, PNG, and JPG once downloaded. Therefore, without any further ado, download and utilize this sample presentation as per your liking.





Slide 1 of 5
This is a status update and project progress report ppt powerpoint presentation styles mockup. This is a five stage process. The stages in this process are weekly progress reports, weekly performance reports, weekly progress tracking.





Slide 1 of 5
This is a project progress status updates template ppt powerpoint presentation file icons. This is a four stage process. The stages in this process are task completion, assignment completion, work completion.


Slide 1 of 2
This slide shows the dashboard representing the weekly status report of the software development projects undertaken by the IT department in order to measure the performance of the development team. It includes status of project along with its budget, overdue tasks, workload and upcoming deadlines. Pitch your topic with ease and precision using this Weekly Project Status Update Summary Document For Performance Measurement Mockup PDF. This layout presents information on Planning, Design, Development, Testing. It is also available for immediate download and adjustment. So, changes can be made in the color, design, graphics or any other component to create a unique layout.


Slide 1 of 2
This slide represents a dashboard showing the weekly status of the software development projects of the IT department. It represents pie chart showing failed login rate, status of projects and aborted connects. Pitch your topic with ease and precision using this Software Development Project Weekly Status Update Summary Document Inspiration PDF. This layout presents information on High Failed, Login Rate, Abort Connects, Failed Login. It is also available for immediate download and adjustment. So, changes can be made in the color, design, graphics or any other component to create a unique layout.


Slide 1 of 2
This slide shows the weekly progress report of marketing campaign projects handled by the marketing team. It includes information related to total cost incurred, total impressions, clicks, acquisitions, daily impressions by campaigns etc. related to the projects. Pitch your topic with ease and precision using this Marketing Project Campaigns Weekly Status Update Summary Document Formats PDF. This layout presents information on Total Impressions, Total Clicks, Total Acquisitions. It is also available for immediate download and adjustment. So, changes can be made in the color, design, graphics or any other component to create a unique layout.


Slide 1 of 2
This slide represents the weekly report of the project handled by the financial department of the organization. It includes dashboard showing the health of the project, tasks, workload, time, cost and progress of the project. Showcasing this set of slides titled Financial Team Project Weekly Status Update Summary Document Background PDF. The topics addressed in these templates are Projects, Dashboard, Reports, Workload, Roadmap. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.


Slide 1 of 2
Persuade your audience using this Project Assignment Sheet With Status Update Graphics PDF. This PPT design covers four stages, thus making it a great tool to use. It also caters to a variety of topics including Project Assignment Sheet. Download this PPT design now to present a convincing pitch that not only emphasizes the topic but also showcases your presentation skills.


Slide 1 of 2
Pitch your topic with ease and precision using this project status updates with business milestones icons pdf. This layout presents information on project status updates with business milestones. It is also available for immediate download and adjustment. So, changes can be made in the color, design, graphics or any other component to create a unique layout.


Slide 1 of 2
Showcasing this set of slides titled project status update with business accomplishments topics pdf. The topics addressed in these templates are project status update with business accomplishments. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.


Slide 1 of 2
This template covers project execution plan which covers project initiation , approval of deliverables and setting standards for quality assurance. Further, it covers project execution reporting and updating plan schedule accordingly Persuade your audience using this project implementation action plan with status update template pdf. This PPT design covers nine stages, thus making it a great tool to use. It also caters to a variety of topics including project execution initiation, gather project team, making amendments in project team, project status reporting and review meetings. Download this PPT design now to present a convincing pitch that not only emphasizes the topic but also showcases your presentation skills.


Slide 1 of 2
Presenting this set of slides with name project status update and reporting ppt powerpoint presentation icon backgrounds pdf. The topics discussed in these slides are monitoring, analysis, troubleshooting. This is a completely editable PowerPoint presentation and is available for immediate download. Download now and impress your audience.


Slide 1 of 2
Presenting this set of slides with name project status report and update table ppt powerpoint presentation file show pdf. The topics discussed in these slides are assignee, due date, action item. This is a completely editable PowerPoint presentation and is available for immediate download. Download now and impress your audience.









Slide 1 of 9
This slide represents the four month updates list for website development project. It includes activities such as information gathering, planning, design, internal and external testing, bug fixing, maintenance etc.Pitch your topic with ease and precision using this Website Development 4 Months Project Status Update Introduction PDF. This layout presents information on Information Gathering, Internal Testing, External Testing. It is also available for immediate download and adjustment. So, changes can be made in the color, design, graphics or any other component to create a unique layout.









Slide 1 of 9
This slide covers the four months project status update of software upgradation project. It includes activities such as project resources, design, draft specs, coding, testing, training etc.Showcasing this set of slides titled Software Upgradation 4 Months Project Status Update Information PDF. The topics addressed in these templates are Analysis Complete, Functional Design, Project Status Report. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.

Slide 1 of 1
This slide represents four months update list of software development project handled by the IT team of the organization. It includes release of various software versions during four months.Presenting Software Development 4 Months Project Status Update Diagrams PDF to dispense important information. This template comprises four stages. It also presents valuable insights into the topics including Update Account Setup, Enable Syncing, Change Parameters. This is a completely customizable PowerPoint theme that can be put to use immediately. So, download it and address the topic impactfully.









Slide 1 of 9
This slide covers the four months status update of social media marketing project. It includes activities related to blogs, guest authorship, emails, webpage content, video or audio etc.Pitch your topic with ease and precision using this Social Media Marketing 4 Months Project Status Update Graphics PDF. This layout presents information on Customer Testimonial Outreach, Recorded Interview, Building Relationships. It is also available for immediate download and adjustment. So, changes can be made in the color, design, graphics or any other component to create a unique layout.

Slide 1 of 1
This slide represents the four months update of product development project. It includes details related to milestones, deliverables, alignment, research and evaluation. Showcasing this set of slides titled Product Development 4 Months Project Status Update Download PDF. The topics addressed in these templates are Prepare Presentation, Criteria Assessment, Project Evaluation. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.









Slide 1 of 9
This slide represents the four months update list of marketing research project. It includes various activities under product and service management, branding and marketing, channel management and sales and post sales.Pitch your topic with ease and precision using this Product And Marketing Research 4 Months Project Status Update Pictures PDF. This layout presents information on Branding Marketing, Channel Management, Service Management . It is also available for immediate download and adjustment. So, changes can be made in the color, design, graphics or any other component to create a unique layout.

Slide 1 of 1
This slide represents the four months status update of new product launch project. It includes activities related to launch, market research, update buyer personas, feature complete, launch activities, overview video, sales slides, blog post etc.Showcasing this set of slides titled New Product Launch 4 Months Project Status Update Brochure PDF. The topics addressed in these templates are Market Research, Update Buyer Personas, Overview Video. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.









Slide 1 of 9
This slide represents the four months status update of new product launch project. It includes activities related to launch, market research, update buyer personas, feature complete, launch activities, overview video, sales slides, blog post etc.Pitch your topic with ease and precision using this Mobile Application Development 4 Months Project Status Update Icons PDF. This layout presents information on Feature Complete, Launch Activities, Sales Training. It is also available for immediate download and adjustment. So, changes can be made in the color, design, graphics or any other component to create a unique layout.

Slide 1 of 1
This slide represents the four months update of mobile application development project. It includes activities such as planning and research, design, development, testing, maintenance etc.Showcasing this set of slides titled Marketing Team 4 Months Project Status Update Information PDF. The topics addressed in these templates are Planning Research, Maintenance, Development. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.









Slide 1 of 9
This slide represents the four months status update of marketing team project. It includes various activities such as data collection, market research, content creation, welcome program, sales emails etc.Persuade your audience using this It 4 Months Project Status Update Icon Introduction PDF. This PPT design covers four stages, thus making it a great tool to use. It also caters to a variety of topics including Market Research, Data Collection, Post Sales. Download this PPT design now to present a convincing pitch that not only emphasizes the topic but also showcases your presentation skills.

Slide 1 of 1
Showcasing this set of slides titled Infrastructure Construction 4 Months Project Status Update Diagrams PDF. The topics addressed in these templates are IT 4 Months, Project Status, Update Icon. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.









Slide 1 of 9
This slide covers the four months status update of infrastructure construction project. It includes various activities such as floor finishes, tiling, adhesive application, marking, preparatory site work etc.Pitch your topic with ease and precision using this Information Technology 4 Months Project Status Update Guidelines PDF. This layout presents information on Adhesive Application, Preparatory Site Work, Layout Presentation. It is also available for immediate download and adjustment. So, changes can be made in the color, design, graphics or any other component to create a unique layout.

Slide 1 of 1
This slide covers the four months project status update of software implementation project undertaken by the IT team. It includes various activities to be performed under IT help desk, web server, network and global security.Showcasing this set of slides titled Influencer Marketing 4 Months Project Status Update Icon Slides PDF. The topics addressed in these templates are Global Security, Network Speed, Security Plan . All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.









Slide 1 of 9
Presenting Human Resource 4 Months Project Status Update Icon Topics PDF to dispense important information. This template comprises three stages. It also presents valuable insights into the topics including Human Resource, 4 Months Project, Status Update Icon. This is a completely customizable PowerPoint theme that can be put to use immediately. So, download it and address the topic impactfully.

Slide 1 of 1
This slide covers the four months status update of an event marketing project. It includes various activities such as event websites, email, social media, partner sponsorship etc.Pitch your topic with ease and precision using this Event Marketing 4 Months Project Status Update Formats PDF. This layout presents information on Launch Announcement, Announcement Posts, Marketing Project. It is also available for immediate download and adjustment. So, changes can be made in the color, design, graphics or any other component to create a unique layout.









Slide 1 of 9
This slide covers the four months status update of email marketing campaign project. It includes various activities under project planning, content, design, marketing channels, website, email etc. Showcasing this set of slides titled Email Marketing Campaign 4 Months Project Status Update Template PDF. The topics addressed in these templates are Marketing Campaign, Campaign Graphics, Marketing Channels. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.

Slide 1 of 1
This slide covers the four months status update of digital marketing project. It includes various activities such as content marketing, public relations, search engine marketing, campaigns, social media etc.Pitch your topic with ease and precision using this Digital Marketing 4 Months Project Status Update Graphics PDF. This layout presents information on Public Relations, Engine Marketing, Content Marketing . It is also available for immediate download and adjustment. So, changes can be made in the color, design, graphics or any other component to create a unique layout.









Slide 1 of 9
This slide represents the four months update status of construction project. It includes activities related to concept development, system and detail design, test refine and produce etc.Showcasing this set of slides titled Construction 4 Months Project Status Update Sample PDF. The topics addressed in these templates are Marker Analysis, Complete Definition, Economic Analysis. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.









Slide 1 of 9
This slide represents project workstream updates report for updating platform. It covers project summary, RAG status, required decisions and milestones. Pitch your topic with ease and precision using this Workflow Status Updates Project Status Report Ppt Show Graphics PDF. This layout presents information on Key Deliverables, Required Decisions, System Automation. It is also available for immediate download and adjustment. So, changes can be made in the color, design, graphics or any other component to create a unique layout.









Slide 1 of 9
This slide depicts project software development workstream updates. It covers activities such as planning, scheduling, resource allocation, risk management and software configuration. Pitch your topic with ease and precision using this Software Project Roadmap Showcasing Workflow Status Updates Ppt Professional Microsoft PDF. This layout presents information on Planning, Scheduling, Resource, Risk Management. It is also available for immediate download and adjustment. So, changes can be made in the color, design, graphics or any other component to create a unique layout.









Slide 1 of 9
Presenting Project Workflow Status Updates Timeline With Milestones Icon Ppt Summary Structure PDF to dispense important information. This template comprises one stages. It also presents valuable insights into the topics including Project Workflow, Status Updates, Timeline Milestones, Icon. This is a completely customizable PowerPoint theme that can be put to use immediately. So, download it and address the topic impactfully.









Slide 1 of 9
This slide exhibits website designing workstream updates status report. It covers project name, summary, management, key phases, progress, status, tasks completed etc. Showcasing this set of slides titled Project Website Designing Workflow Status Updates Status Report Ppt Layouts Introduction PDF. The topics addressed in these templates are Project Summary, Item Description, Project Budget. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.









Slide 1 of 9
This slide represents project portfolio workstream status updates. It covers project status, status category and project cost that enable organization to track the project progress and take action required. Pitch your topic with ease and precision using this Project Portfolio Workflow Status Status Update Ppt Visuals PDF. This layout presents information on Project Status, Project Status Category, New Project. It is also available for immediate download and adjustment. So, changes can be made in the color, design, graphics or any other component to create a unique layout.









Slide 1 of 9
This slide represents project portfolio workstream status updates. It covers project status, status category and project cost that enable organization to track the project progress and take action required. Presenting Project Members Workflow Status Update Icon Ppt Inspiration Clipart PDF to dispense important information. This template comprises one stages. It also presents valuable insights into the topics including Project Members, Workflow Status, Update Icon. This is a completely customizable PowerPoint theme that can be put to use immediately. So, download it and address the topic impactfully.









Slide 1 of 9
This slide represents the weekly status report of the website development project undertaken by the IT department of the organization. It includes details related to the project name, code, manager, tasks completed, delayed, planned and project, project budget and key project risks and issues. Showcasing this set of slides titled Website Development Project Weekly Status Update Summary Document Pictures PDF. The topics addressed in these templates are Project Summary, Project Budget, Tasks Planned. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.









Slide 1 of 9
This slide represents a dashboard representing the weekly status report of an IT project prepared by the project management team. It includes details related to ongoing activities, top issues, breakdown chart, project plana and timeline and outstanding issues of the project. Showcasing this set of slides titled Project Management Weekly Project Status Update Summary Document Dashboard Sample PDF. The topics addressed in these templates are Burndown Chart, Outstanding Issues, Project Timeline. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.









Slide 1 of 9
Presenting Executive Project Weekly Status Update Summary Document Icon Pictures PDF to dispense important information. This template comprises three stages. It also presents valuable insights into the topics including Executive Project, Weekly Status Update, Summary Document, Icon. This is a completely customizable PowerPoint theme that can be put to use immediately. So, download it and address the topic impactfully.









Slide 1 of 9
This slide demonstrates the dashboard representing the weekly status of the projects undertaken by the digital marketing team of the organization. It includes data related to program health, portfolio trend, actual budget, projects at risk, pricing promotion activities etc. related to the project. Showcasing this set of slides titled Digital Marketing Weekly Project Status Update Summary Document Formats PDF. The topics addressed in these templates are Program Health, Portfolio Trend, At Risk Projects. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.









Slide 1 of 9
This slide represents the dashboard showing the weekly status of the digital marketing project of the organization. It shows details related to project status, manager, sponsor, schedule, execution timeline, key risks and issues of the project. Pitch your topic with ease and precision using this Digital Marketing Project Weekly Status Update Summary Document Mockup PDF. This layout presents information on Project Status, Project Manager, Execution Timeline. It is also available for immediate download and adjustment. So, changes can be made in the color, design, graphics or any other component to create a unique layout.









Slide 1 of 9
Showcasing this set of slides titled Construction Project Weekly Status Update Summary Document Icon Slides PDF. The topics addressed in these templates areConstruction, Project Weekly Status, Update Summary, Document Icon. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.









Slide 1 of 9
Create an editable Project Portfolio Workstream Status Update that communicates your idea and engages your audience. Whether you are presenting a business or an educational presentation, pre-designed presentation templates help save time. Project Portfolio Workstream Status Update is highly customizable and very easy to edit, covering many different styles from creative to business presentations. Slidegeeks has creative team members who have crafted amazing templates. So, go and get them without any delay. This slide represents project portfolio workstream status updates. It covers project status, status category and project cost that enable organization to track the project progress and take action required.









Slide 1 of 9
Find a pre-designed and impeccable Monthly Project Status Update Report. The templates can ace your presentation without additional effort. You can download these easy-to-edit presentation templates to make your presentation stand out from others. So, what are you waiting for Download the template from Slidegeeks today and give a unique touch to your presentation. The slide communicates a status update report for project management. It includes tasks, start and end date, progress and comments.









Slide 1 of 9
The slide communicates a status update report for project management. It includes tasks, start and end date, progress and comments. Get a simple yet stunning designed Monthly Project Status Update Report PPT Slide SS. It is the best one to establish the tone in your meetings. It is an excellent way to make your presentations highly effective. So, download this PPT today from Slidegeeks and see the positive impacts. Our easy-to-edit Monthly Project Status Update Report PPT Slide SS can be your go-to option for all upcoming conferences and meetings. So, what are you waiting for Grab this template today. The slide communicates a status update report for project management. It includes tasks, start and end date, progress and comments.



Slide 1 of 3
Present your ideas with confidence using One Page Street Project Status Updates Newsletter Bifold PPT Template. Our PPT Slide offer a clean, modern design that is easy to use and customize. With complete flexibility over design and content, it is the perfect template for your presentation. Impress your audience with One Page Street Project Status Updates Newsletter and deliver your message with clarity and impact.
48 Item(s)